halfwayliner wrote:I have not got a clue,but does anybody know when they are going to finish them bl---y roadworks outside Revolution.The have nearly built a section of motorway since that job has started. How slow has this job been.![]()
Crazeenick wrote:I think there had been an accident of some sort. My son was caught up in the jam and saw an ambulance with sirens/lights trying to get through.
Christies Child wrote:Are they working 24/7 to get the roadworks completed?
If they are only working during daylight hours and with the clocks changing tonight the amount of daytime working will be reduced.
P/T Indie wrote:We have just been talking about that surley town will not be going to one lane and that will be a bike lane
halfwayliner wrote:I have not got a clue,but does anybody know when they are going to finish them bl---y roadworks outside Revolution.The have nearly built a section of motorway since that job has started. How slow has this job been.![]()
Callum wrote: How can the council give the go ahead to 2 separate sets of roadworks in the same area?
Richard (Barrow) wrote:Callum wrote: How can the council give the go ahead to 2 separate sets of roadworks in the same area?
The council probably dont have any say in the matter regarding the M6 that will be down to the Highways Agency, a law unto themselves.
Richard Head wrote:Last night about 6.30 the traffic trying to get into Lancaster from the south was horrendous. This was because one lane was coned off at Penny Street bridge. There wasnt any work being done there, just one van parked in the coned off area with its driver sat in the cab reading
Richard Head wrote:9 weeks of disruption and god knows how many thousands spent on the road works outside Revolution and can anyone see a big difference to how the traffic island was before?