Heysham_Shrimp wrote:The bad news is work on the road won't start until Autumn 2010 !!
According to the NOTICE issued yesterday it's June this year...
II.2.1) Total quantity or scope: Lancashire County Council is seeking to
establish a select list of contractors to tender for the construction of
Heysham to M6 Link Road including associated highway and bridge/structural
works. The works consist of the construction of a link road between the
already built length of A683 Heysham to M6 Link, at its junction with the
A589 Morecambe Road near Torrisholme and a fully remodelled junction 34 on
the M6 motorway near Halton. The route is a 4.8 km long two-lane dual
carriageway all-purpose road with intermediate junctions and a combined
footway/cycleway along its full length. The scheme includes alterations to
the local road network including existing junctions. There will be a
requirement to construct 23 major structures including bridges over the
West Coast Mainline railway, Lancaster Canal and the River Lune. A park
and ride site is included at the M6 Junction 34 and there will be a
dedicated bus lane along Caton Road into the city centre. The estimated
cost of the works is in the order of 100 000 000 GBP at current prices.
II.3) DURATION OF THE CONTRACT OR TIME-LIMIT FOR COMPLETION: Starting:
15.6.2009. Completion: 15.12.2012.